Gallery of Progress - Page 1
Phase 1 - 2012-13 Acquisition and begin the demolition of Lakeside Mobile Home Park
Phase 2 - 2014 Demo former access roads, trailer pads, trees, stumps and former utility services
|
Phase 3 - 2014 Controlled burn of trees, stumps and other debris - Oak Grove Fire Dept
|
Phase 4 - 2015-16 Site plan & Roadway design, roadway grading and erosion control
|
There were 4 trailers on the property with residents. The residents were relocated with their trailers or when the trailers were not road worthy, the trailers were demolitioned and recycled.
|
Phase 5 - 2016 Paving and Valley Curbing Installed
|
over 400 ft of 18inch storm drainage pipes
gingerly bring water from roadway without
erosion
Erosion control was mitigated
with mesh fiber and grass
seed planted and covered with
hay until the grass was able to
germinate and take root.
GP Lookadoo's former country store was left abandoned for 25 years. Finally removed along with the asphalt driveway and parking area.
|