Gallery of Progress - Page 1
Phase 1 - 2012-13 Acquisition and begin the demolition of Lakeside Mobile Home Park
Phase 2 - 2014 Demo former access roads, trailer pads, trees, stumps and former utility services
Phase 3 - 2014 Controlled burn of trees, stumps and other debris - Oak Grove Fire Dept
Phase 4 - 2015-16 Site plan & Roadway design, roadway grading and erosion control
There were 4 trailers on the property with residents.  The
residents were relocated with their trailers or when the
trailers were not road worthy, the trailers were demolitioned
and recycled.
Phase 5 - 2016 Paving and Valley Curbing Installed
over 400 ft of 18inch storm drainage pipes
gingerly bring water from roadway without
erosion
Erosion control was mitigated
with mesh fiber and grass
seed planted and covered with
hay until the grass was able to
germinate and take root.
GP Lookadoo's former country store was left abandoned
for 25 years.  Finally removed along with the asphalt
driveway and parking area.